Lotte Biologics Building #32
Syracuse, NY
Client: Lotte Biologics
Size: 35,000 sq. ft.
Architect: CRB Architects-Engineers P.C.
Date Completed: December 2025
The Building 32 renovation at LOTTE Biologics’ Syracuse Bio Campus transformed an existing manufacturing facility into a state-of-the-art space dedicated to antibody-drug conjugate (ADC) production, supporting the company’s expanding contract development and manufacturing (CDMO) operations. Following LOTTE Biologics’ acquisition of the former Bristol Myers Squibb campus in 2023, the project became a cornerstone of the company’s investment in advanced biopharmaceutical manufacturing in Central New York.
Completed as part of a $100 million investment, the renovated facility was designed to support clients from clinical development through commercial-scale manufacturing. Building 32 features integrated production and purification processes, in-house quality control laboratories, advanced characterization capabilities, and a flexible single-use manufacturing system. The facility also includes a 1,000-liter conjugation reactor, enabling end-to-end ADC production from antibody preprocessing and conjugation through purification and aseptic filling.
Constructed within an active pharmaceutical manufacturing campus, the renovation required careful coordination to maintain ongoing operations while modernizing highly specialized process spaces. The completed project complements the Syracuse Bio Campus’ existing biologics infrastructure, including 40,000 liters of commercial manufacturing capacity, eight 5,000-liter stainless steel bioreactors, and extensive analytical, quality control, and warehousing facilities supporting global pharmaceutical production.
Today, Building 32 serves as a key component of LOTTE Biologics’ U.S. manufacturing operations, strengthening the company’s global CDMO capabilities while reinforcing Central New York’s position as a leading hub for advanced biologics manufacturing.